424 Gold Way

Project Summary: Developer plans to renovate the interior of the building, adding ten residential units to the existing two and converting the ground floor into a gym and the first floor into a play area. There will be no construction outside the existing shell of the building, and the only exterior renovations will be replacing the windows throughout and adding two new storefront entrances at the rear.